Our Spring 2013 Parade of Homes condo at 7372 Rock Canyon is nearing completion! Some of the final touches are coming together, and they look great!
Here are a couple of pictures of a built in niche in the front entrance. A recessed light shines down on the foil backed mosaic tile and the Corian counter tops! Also, the custom built Corian shower is almost complete. The walls and floor has been installed, along with the decorative brick on the outside. Next the glass door and wall will be installed!